banner_img_fleming.jpg
 
 
 
 
 
 
 
Monday, 24 August 2009

Fleming College KTCT almost completed

As of 4 pm Thursday Aug 20 most of the college new trail work is completed.

Section 1: Limestone Screenings will be installed- need to be leveled and compacted. The new berm is done, Dave will have the edges cleaned up later.

Section 1: from Student Residence to the Emergency Telephone - limestone screenings have to be leveled and compacted.

Section 2: this area will be tackled tomorrow

Section 3: Access to nature trail - the brushing is done - need to level/grade and add new screenings. this will not take too long.

Section 4: The new trail is excavated - subgrade material is being installed later today. Screenings will go on tomorrow

Section 5: area from Compost toilet to screen fence - this area will be excavated tomorrow

Section 6: limestone screenings is done - need to level and compact

Section 7: To be completed by Monday

KTCT in the News

Click the links below to download various newspaper clippings about the trail.

 Official Opening1.7 MB
 Robin Esrock Book Tour1.3 MB
 Love Your Trail Campaign2.7 MB

Downloads

Click any of the links below to download a PDF of one of our brochures, reports, or newsletters.

General Brochure 7.2 MB
Donation Brochure 2.3 MB
Donor Acknowledgement 3.6 MB
2015-16 Annual Report 600 KB
2018 Photography Workshop 470 KB
KTCT Newsletter