As of 4 pm Thursday Aug 20 most of the college new trail work is completed.

Section 1: Limestone Screenings will be installed- need to be leveled and compacted. The new berm is done, Dave will have the edges cleaned up later.

Section 1: from Student Residence to the Emergency Telephone - limestone screenings have to be leveled and compacted.

Section 2: this area will be tackled tomorrow

Section 3: Access to nature trail - the brushing is done - need to level/grade and add new screenings. this will not take too long.

Section 4: The new trail is excavated - subgrade material is being installed later today. Screenings will go on tomorrow

Section 5: area from Compost toilet to screen fence - this area will be excavated tomorrow

Section 6: limestone screenings is done - need to level and compact

Section 7: To be completed by Monday

Published in Blog
Monday, 24 August 2009

iPod Draw Winner

The winner of the I Pod Draw is:

Janice Jones-Skinner Lindsay

Secondary prizes of a pedometer were won by:

Barb Boyd- Lindsay

Stacy Meenan- Lindsay

Thank you to all who submitted a ballot and remember to check this web site regularly and keep using the Kawartha Trans Canada Trail.

Published in Blog

Work has started on sections of the Kawartha Trans Canada Trail on Sir Sandford Fleming College property. It is expected that the trail will be completed on their property by end of August.

Published in Blog

Barry Devolin MP for City of Kawartha Lakes gathers with trail volunteers on the KTCT near Mariposa Public School to officially annouce funding for the construction of the Kawartha Trans Canada Trail in the amount of $75,450.00

Published in Blog

The construction of the westerly portion of the KTCT on the abandoned railway line from Durham Road 2 easterly to the Highway 7 overpass west of Lindsay has begun. The contractor, "Evansgolf Corporation" out of Brechin has completed the brushing and clearing of the trail to a width of 4 metres. The contractor is now in the process of bulldozing the trail bed to clear it of the remaining grass and vegetation and preparing the 3 metre wide trail bed. The bulldozing work started at the Durham Road 2 (Simcoe Street) and as of August 5th was completed easterly to White Rock Road. It is anticipated that the bulldozing will continue for the next week. Once the clearing is complete the contractor will be laying down the 3 metre wide trail bed made of crushed limestone.

During the construction period the trail is closed to the public and will not be opened until all the construction is complete.

In addition to the construction on the abandoned railway bed portion of the trail, the contractor will soon be starting the construction of that portion of the KTCT on the Fleming College property east of Angeline St. in Lindsay.

Stay tuned for more updates as construction continues.

Published in Blog
Thursday, 06 August 2009

FREE INTERPRETATIVE PODCAST

FOR YOUR FREE TRANS CANADA TRAIL INTERPRETATIVE PODCAST VISIT OUR HOSTING SITE FOR THIS PODCAST: www.greentrailsalliance.ca

EMAIL US TO LET US KNOW HOW YOU LIKE THE PODCAST.

Published in Blog

KTCT in the News

Click the links below to download various newspaper clippings about the trail.

 Official Opening1.7 MB
 Robin Esrock Book Tour1.3 MB
 Love Your Trail Campaign2.7 MB

Downloads

Click any of the links below to download a PDF of one of our brochures, reports, or newsletters.

General Brochure 7.2 MB
Donation Brochure 2.3 MB
Donor Acknowledgement 3.6 MB
2015-16 Annual Report 600 KB
Photography Workshop 1 MB
KTCT Newsletter